Wednesday, February 18, 2015

DIY Network

Highlights: Step 1: Position the Drain-Waste-Overflow Pipe

Assemble the drain-waste-overflow pipe assembly.

Fit the rubber gasket onto the pipe&rsquo,s top opening (the waste overflow), and insert this section into the upper hole in the back of the tub.

Align the bottom portion of the pipe (the drain tailpiece) with the tub drain hole.

Step 2: Install the Drain Flange

Place a thick bead of plumber's putty around the bottom of the drain flange.

Position the drain flange in the bottom hole of the tub and screw it into the drain tailpiece opening.

Step 3: Install the Trip Lever Assembly

Assemble the trip lever and pop-up drain stopper components according to the manufacturer's instructions, but do not attach the stopper. Leave all connections loose enough so that you can easily reposition the assembly during installation.

The assembly has an adjusting nut on the upper rod and a second adjustment bar on the lower linkage. Adjust as needed so that the lever and lower arm operate freely, and the connection for the pop-up stopper is accessible in the drain opening.

Install the trip lever assembly by feeding it through the upper (overflow) hole in the back of the tub.

Fasten the trip lever assembly to the tub overflow cover plate with the screws provided. Fasten it securely but do not overtighten.

Attach the pop-up stopper to the linkage at the bottom of the trip lever assembly.

Courtesy of James Calloway

Source

Related Posts:

  • Marriott Vacation ClubMarriott Vacation Club With more than 400,000 members participating in Marriott Vacation Club ownership worldwide, Marriott has been a well-known and … Read More
  • Chippendale Style FurnitureLearning to Identify a Popular Style Chippendale Style Chair with Yoke Back, Pierced Splat, Cabriole Legs, and Ball and Claw Feet, c. 1765-1175. - Pri… Read More
  • What Are the Specs for Kenmore Washer 110?How They Measure Up Kenmore 110 series washers are 27 inches deep, 27.5 inches wide and 42 inches tall at the highest point of arched control panel. T… Read More
  • How to Lay New Hardwood FloorDry Fitting for Layout Run the new flooring at right angles to floor joists. There needs to be a 3/4-inch space left open along all edge of the room. … Read More
  • Remote proctorI. Policy Issues Is the Remote Proctor Camera linked to the Angel Exam? No, the camera and the exam are two separate items. The exam is in the Angel… Read More

0 comments:

Post a Comment